Emirates Steel Phase 3. Abu Dhabi, U.A.E.

Reparation of a boiler convection section.

Scope of work:

  • Disassembly supervision
  • Assembly supervision
  • Welding works:
    • XTM
    • Stainless Steel (AISI 310)
    • Carbon Steel