Experimental Water Treatment Plant

Prefabrication and assembly of experimental water treatment plant consisted of 4 modules (15.000” of piping, equipment, exchangers, pumps, vessels and valves).

Welding works:

  • Duplex 2205 and superduplex
  • Alloy 625
  • Inconel
  • Stainless steel 316
  • Carbon steel